Project

FRP Highway 101 Gold Project

Underexplored Gold Asset

23
contiguous claims
471
hectares
100%
option
  • On the North Branch of the Porcupine-Destor Deformation Zone (PDDZ)
  • Adjoins Agnico Eagle's past-producing Holt & Holloway Mines
  • Only 4 historic drill holes ever completed — none through the central target
  • 2022–2025 high-resolution Mag + VLF-EM surveys completed
  • Immediate drill-ready targets under thin glacial cover
FRP Highway 101 Project Location Map

Geological Setting

The property lies directly on the projected North Branch of the Porcupine-Destor Deformation Zone (NB PDDZ) — the same major gold-controlling structure that hosts multiple multi-million-ounce deposits in the Abitibi.

Regional mapping (Ontario Geological Survey) confirms the NB PDDZ runs through the centre of the claims. Areas of outcrop are evident in the north and south portions of the property, however, the central target zone is covered by glacial sand and clay — creating a classic "blind" discovery opportunity.

Alteration (sericite, silica, carbonate, pyrite) in the volcanics is similar to mineralized zones at the adjacent Holt and Holloway mines.

Geological survey 1
Magnetometer Survey – Combined total field magnetic contoured plan superimposed on VLF in-phase / out-phase profiles.
Geological survey 2
Compiled CXS Magnetometer surveys showing interpreted geology after Jensen (1982) and OGS AEM conductors.
Geological survey 3
VLF-EM data: Note the major crossovers - major structures or interflow gfc seds, and the multitude of minor crossovers

Historic Work & Geophysics

Highly underexplored: Only four drill holes were completed on the property (Lacana Mining, 1988). None tested the central portion of the North Branch PDDZ

Significant gold anomalies were returned, including:

  • Up to 300 ppb Au over significant widths
  • FR88-03: 235 ppb Au over 9.1 m (30 ft)
  • FR88-03: 176 ppb Au over 18.3 m (60 ft)
  • OGS basal till sample returned 440 ppb Au south of the projected NB PDDZ.
  • 2022–2025 high-resolution Mag + VLF-EM surveys (150 m grid) have now defined strong conductive horizons that parallel and cross cut the NB PDDZ.
Historic drilling and geophysics
Compiled VLF Fraser Filter surveys with interpreted structure, geology and VLF trends (long bars). Plan shows approximate locations of 4 Lacana drill holes (white).

Project Potential & Discovery Upside

The project remains highly underexplored, with only four documented holes drilled by Lacana Mining in 1988 — none of them testing the NB PDDZ.

  • The North Branch PDDZ remains completely untested by drilling
  • Glacial sand and clay cover the target zone. The 2022–2025 Mag + VLF-EM surveys have identified multiple strong conductive horizons parallel and crosscutting the NB PDDZ and helped to interpret the geology and structure.
  • Proposed diamond drill program will target the heart of the structure and other strong anomalies under thin glacial cover.
  • The alteration and geological setting are consistent with the gold systems in the surrounding area.
Low-cost, fully funded Phase 1 drill program — ready to unlock the next Abitibi discovery in 2026.
Historic drilling and geophysics
Compiled VLF Fraser Filter surveys with interpreted structure, geology and VLF trends (long bars). Plan shows approximate locations of 4 Lacana drill holes (white).

Join the Journey

Sign up for regular updates on our progress.